The Facts

What Pacifico Energy proposed at the Sept. 15, 2026 Commissioners Court workshop, what its Pecos County model is permitted to do, and what’s at stake for the Big Bend.

All the Emissions of Houston. Enough Power for LA. Our New Front Yard?

7.65 GW

at the Pecos County sister project — bigger than any U.S. power plant, even Grand Coulee (7.1 GW)

2× Larger

than the largest U.S. gas plant (3.8 GW) — and more than Los Angeles uses on its hottest day (6.5 GW)

33M Tons

of greenhouse gases a year allowed there — nearly as much as the entire city of Houston (34M)

12,000+ Tons

a year of air pollutants allowed there (soot, ammonia, CO, VOCs) — particles that can drift hundreds of miles

7.65 GW, 33M and 12,000+ are permit limits for Pacifico’s GW Ranch in Pecos County, the project Pacifico named as its model. Brewster’s plant hasn’t been sized yet.

Record-Breaking, Just Miles From Town

Pacifico’s model is its Pecos County plant: 35 gas turbines on 3,000–4,000 acres — up to nearly half of the roughly 8,400 acres the Ahern family’s company owns in Brewster County, about 19 miles from both Alpine and Marathon (see it on the map), permitted to be bigger than any U.S. power plant. It’s planned “off-grid,” with its own power plant, to sidestep state regulation and power-line building timelines. But “off-grid” isn’t a promise: a likely later hookup could bring giant 765-kV power lines. For a sense of size, PBS filmed one from the air: Stargate, near Abilene, covers 1,100 acres (see it to scale).

Scarred at Both Ends?

In south Brewster County, Judge Henington and 140+ local businesses have fought a border wall through Big Bend National Park, whose visitors bring $56.8 million a year to the area. Now a record-scale gas plant could rise in the north end, on Highway 67 — the scenic road into Alpine traveled by many of the park’s 500,000+ yearly visitors. A lasting haze over the Glass Mountains, Marathon and Alpine: the same scars, at our northern gateway.

Testing the Limits of Our Water

This is a desert in drought: parts of Brewster County hit exceptional drought this year, and every ranch and town here runs on wells. Yet there’s no water source and no usage figure, just a plan to test the Hovey Trough, which Pacifico’s team called “not a studied aquifer.” Our aquifers are already targeted: Midland–Odessa’s water district seeks Glass Mountains wells to pump 25,000 acre-feet a year from the slow-recharging Capitan Reef. Why risk our limited water or haul polluted water here, when the Permian has a billion gallons a day of oilfield water it can’t get rid of?

Worth the Cost?

New tax revenue is real money — but weigh what comes with it. Abilene’s AI data center brought nearly 6,000 construction workers a day — to a city of 125,000. Here, that’s as many people as live in all of Alpine, through a 5–7 year buildout: man camps, crowded roads, scarce housing and small schools overwhelmed. After that, just 100–200 permanent jobs, and Pacifico’s rep said workers from Reeves County and Odessa may not “go live in Alpine.” Add the health cost: the EPA links soot like the plant’s to aggravated asthma, heart attacks and early deaths. The ranching, ag and tourism that sustain us will likely pay the price.

No More Dark Skies, No More Quiet Nights?

Our lighting rules exempt temporary construction lighting — and this buildout runs 5–7 years. Twenty-one construction lights, each 7–16 times the county’s cap, already sit at the border-wall staging area. The plant would sit about 43 miles from McDonald Observatory. It’s noisy too: a turbine-and-chiller hum that never stops. Lose the dark and the quiet, and we lose our way of life and the stargazers and visitors they bring.

Not Here. North of I-10.

The roads, pipelines and power lines would never leave — “once you cut a road here, it’s here forever.” Communities in the Permian Basin, already shaped by decades of oil and gas, are welcoming projects like this one, and they have the gas, pipelines and oilfield water — plus the housing, workers and infrastructure to support it. If it’s built anywhere, build it there, north of I-10, where its emissions would land farther from Big Bend National Park.

Our Schools Deserve Better Than a Gas Plant

On Nov. 13, the Alpine and Marathon ISD superintendents told local radio listeners this project would be “transformative” for school funding. They’re right that both districts are among the lowest-funded in Texas, and it would bring Marathon ISD real money. But it would transform our whole county too, permanently: our water, our air, our night skies and our way of life. For Alpine ISD, the superintendent’s own estimate is about $3 million a year, and Marathon’s superintendent said “tens of millions” would go back to the state. These districts are poor because of how Texas funds schools, and the Legislature can fix that in 2027. No Texas school should have to host a gas plant to get air conditioning. Talk to your school board, then talk to your legislators.

In Pacifico’s Own Words

From the Sept. 15, 2026 Commissioners Court workshop. Each one links to that moment in the meeting video.

“We’re still in step one.”
Of a five-step process: surveys and meeting stakeholders. No site has been chosen.Watch at 6:03
“…the answer in a lot of cases [is] going to be, we don’t know that yet.”
Pacifico’s answer on project specifics.Watch at 7:40
“…you’re going to have to build a gas pipeline to the project site…”
A new pipeline right-of-way, on top of new roads and possible power lines.Watch at 10:27
“…a bit of a math exercise…”
How many turbines is undecided. Each could be 15 to 385 MW, sized to fit emissions limits.Watch at 39:34
“…it might use less water than the current… use for 200 cattle… This is not a water play at all.”
Landowner James Ahern’s comparison. No actual water figure was given, and the comparison leaves out turbine washing, filling the data center’s cooling loop, construction-camp water and any wet surface air coolers, all of which come on top of it. Sources under study: oilfield water, brackish water or the unstudied Hovey Trough.Watch at 27:26
“You use trucks for that disposal.”
There are no local disposal wells for the salty wastewater, so it would be hauled out on county roads.Watch at 19:23
“…a multi-billion dollar investment ranging from as small as maybe five billion up to 60 billion.”
Landowner James Ahern added that even the low end is “more than all the tax revenue we’re going to collect.”Watch at 42:18
“We’re not looking for incentives.”
But Pacifico is open to “tax structuring” in a development agreement.Watch at 30:21
“…the development agreement is… tied to the land.”
A promise worth holding them to: any agreement should bind every future owner. Pacifico’s Pecos County project now belongs to Amazon.Watch at 22:44

Quotes from the meeting recording; “…” marks words left out and [brackets] mark words added for clarity.

How fast could this move?

The clock is already ticking. Pacifico told the court on Sept. 15 that its surveys for the Brewster site were already underway: threatened and endangered species, wetlands, cultural resources, geotechnical, geophysical, topographic, flood and hydrology. Surveys are the first step toward groundbreaking. Watch at 6:16

Pacifico’s Pecos County project shows the pace, as its team described it on Sept. 15:

~1.5–2 years

from the first surveys to groundbreaking. Pecos County broke ground about two months before the Brewster meeting.

Watch at 40:45
~50 MW

expected online at the Pecos County plant later this year, now run by Amazon.

Watch at 35:42
5–7 years

to full scale, built in phases of roughly 200 MW.

Watch at 35:55

What We Still Don’t Know

Questions Pacifico hasn’t answered, any one of which could change what this project means for Brewster County:

  • Where exactly the plant would go on the ranch, and its boundary.
  • How many turbines, how big, and how much gas they would burn.
  • How much water, during construction and every year after, and from where.
  • Whether it would use water-cooled equipment. Pacifico’s own Pecos County air permit filing lists “wet surface air coolers,” though its team described a nearly dry plant here.
  • Where the salty wastewater would be hauled, and how many truck trips that means.
  • How the data center would connect to the internet. Fiber never came up.
  • Whether its promises would bind a future owner, the way GW Ranch passed to Amazon.
  • What the wildlife, cultural, flood and water surveys now underway have found.
  • What would be built on the 645-acre Ahern section inside Alpine ISD (county record), and what would go on the main ranch in Marathon ISD.
  • Whether Pacifico will seek a state school-tax break (JETI) from Marathon ISD or Alpine ISD, as it did in Bastrop County.

Ask the Commissioners Court to get these answers in writing, and make them public, before any agreement. Texas air researchers recommend the same: data center operators should disclose their electricity use, power sources and resulting pollution before development decisions are made. Here’s how.

Speaking up works. Communities from Hood County, Texas, to Pinal County, Arizona, have stopped gas plants and data centers like this one. See how they did it.

Who Decides the Air Permit

The county doesn’t decide the air permit. The Texas Commission on Environmental Quality (TCEQ) does. Pacifico’s Pecos County model was permitted for up to 33 million tons of greenhouse gases and 12,000+ tons of other air pollutants a year.

Texas air researchers say plants like this deserve that scrutiny. A new Houston Advanced Research Center study finds that data centers’ own on-site gas engines emit about four times as much nitrogen oxides as grid power, and its lead researcher says Texas should “treat data centers as the industrial facilities they are” (The Texas Tribune, Oct. 20, 2026).

When a company applies for a full, case-by-case air permit, the public gets a say:

  • Anyone can submit comments during the comment period, online or by mail.
  • Anyone can ask for a “public meeting” during the comment period. A state lawmaker from the area can request one too.
  • People whose health, safety or property would be affected may be able to ask for a contested case hearing.
  • The applicant must post signs on the property and publish notice in a local newspaper.

There’s a faster route with no public notice. Many gas plants built for data centers are approved by “standard permit.” That route has no newspaper notice, no signs and no comment period (Public Citizen, Nov. 18, 2026). TCEQ’s records show Pacifico used it for a gas plant in Hood County in 2025: 13 days from filing to approval. A plant here could go either route. Other low-level permits skip notice too: PBS’s Overview found that Stargate, near Abilene, began operating under a “permit by rule,” the kind used for a dry cleaner, “with no public notice requirement and no public input or participation.”

Where things stand

As of our latest check of TCEQ’s permit database, no air permit application has been filed for Brewster County. State permit review for data centers resumed the week of Nov. 16, after a two-month pause for a state audit. Comment periods are short once notice goes out, and some permits get no notice at all.

How TCEQ public participation works Get notified when one is filed

Brewster County has time to stop this — speak up now.

No agreements have been signed, and state permit review resumed the week of Nov. 16. An application could now be filed at any time, and some permits are approved with no public notice.